HALFEN BODY
Installation in horizontal joints
Support
anchors
© 2019 HALFEN · INST_BODY 02/19 · www.halfen.com
• Ensure the facade is correctly
measured and tolerances have
been considered
• Erect any required scaff olding
Installation direction:
from left → right or
from right → left
and from bottom → top
• Cut and remove a section of the
thermal insulation to drill the hole
for the anchor bolt. The insulation
is replaced after anchor installa-
tion.
• Drill the dowel holes for the fi rst
and second row of slabs, ensure
correct, minimum drill hole depth
and diameter.
• Remove all dust from the hole.
• Fix and align the lower row of
Body anchors (support anchors)
with approved anchor bolts i. e.
HALFEN HB-BZ.
Note:
Always use the supplied corre-
sponding washer when using
HALFEN Bolts or HALFEN Dowels
to attach the HALFEN Body
anchor, type DH to the load bear-
ing support structure.
• Replace the previously removed
thermal insulation.
• Fill the pin holes with mortar.
st
• Place the 1
row of slabs on
to the support anchors.
• Fix and align the support anchors
nd
for the 2
row of slabs with
approved anchor bolts i.e.
HALFEN HB-BZ.
• Make any fi ne adjustments to the
st
1
row of slabs:
allow at least a 2 mm gap between
the top edge of the lower row and
the bottom edge of the arm of the
support anchor for the 2
• Push the anchor pin through the
hole in the spade bolt and into
the sleeve below.
• Dimensions acc. to detail
"Pin, fi xing hole and joint dimen-
sions [mm]" (see right) must be
observed!
nd
• The 2
row of slabs is then in-
stalled and the procedure repeated.
Assembly Instructions
Important:
Tighten all countersunk
screws and anchor bolts us-
ing a torque wrench adjusted
to the correct torque!
Detail
Pin, fi xing hole and joint dimensions
[mm]
A
Fixing hole
Sleeve
Section A-A
nd
slab row.
≥ 8
≥ 1.5
≥ 1.5
Pin
A
3