Installing The Radio Link; Tools Required - Dometic GROUP WAECO PerfectView VT 100DIG Instrucciones De Montaje Y Del Uso

Tramo de transmisión por radio digital
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 45
VT100DIG
6

Installing the radio link

6.1

Tools required

For installation and assembly, you will need the following tools:
 Drill bit set (fig. 1 1, page 3)
 Electric drill (fig. 1 2, page 3)
 Screwdriver (fig. 1 3, page 3)
 Set of ring or open-ended spanners (fig. 1 4, page 3)
 Measuring ruler (fig. 1 5, page 3)
 Hammer (fig. 1 6, page 3)
 Centre punch (fig. 1 7, page 3)
To establish and test the electrical connection, the following tools are required:
 Diode test lamp (fig. 1 8, page 3) or voltmeter (fig. 1 9, page 3)
 Crimping tool (fig. 1 10, page 3)
 Insulating tape (fig. 1 11, page 3)
 Cable bushing sleeves (optional)
To fasten the module and the cables, you may need additional screws and cable
binders.
6.2
Installing the modules
CAUTION!
!
Select the location of the modules so that they cannot injure the passengers in
the vehicle under any circumstances (e.g. sudden braking, road traffic acci-
dents).
Observe the following installation instructions:
 Install the modules so that as few objects as possible are between them.
Metal objects in particular can hinder radio transmission.
 If possible, install the modules in the vehicle.
The housings are splash-water protected and can be mounted outside the vehicle. In
this case, you need to select a location that is protected against mechanical impacts
(e.g. flying stones).
 The installation location should be flat.
 Before drilling, check each time that there is sufficient space on the other side for the
drill head to emerge (fig. 2, page 4).
EN
Installing the radio link
25

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido