Installation; Introduction; Unpacking; Input Power Requirements - BK Precision 1672 Manual De Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Section 3

Installation

3.1

INTRODUCTION

This unit is tested prior to shipment. It is therefore ready for immediate use
upon receipt. The initial physical inspections should be made to ensure that
no damage has been sustained during shipment.
3.2

UNPACKING

Inspect the packing box on receipt for any external damage. If any external
damage is evident, remove the instrument and visually inspect it's case and
parts for any damage. If damage to the instrument is evident, a description
of the damage should be noted on the carrier's receipt and signed by the
driver or carrier agent. Save all shipping packaging for inspection. Forward
a report of any damage to the agent through which the unit is procured.
Retain the original packing in case subsequent repackaging for return is
required. Use of the original packing is essential.
3.3

INPUT POWER REQUIREMENTS

The instrument can operate on 115V or 230V 50 or 60Hz Line selector plug
on the rear panel allows you to select the line voltage. Before connecting
the power plug to an AC line outlet, be sure to check that voltage Selector
plug is set in the correct position corresponding to the line voltage in your
location and the fuse rating is as shown in the table.
3.1
INTRODUCTION
3.2
UNPACKING
3.3
INPUT POWER REQUIREMENTS
3.4

SYSTEM CONFIGURATION

3.5
INSTALLATION
3.6

OPERATING INSTRUCTIONS

4

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido