Descargar Imprimir esta página

CAMBRIDGE Pre-Cut & Pre-Packaged MaytRx Wall Kitchen Kit Manual De Instrucciones página 18

Publicidad

Glue veneer chips to lintels
and clamp until dry
Layer 6:
Piece Count = (5) Corners, (5) A stones, (8) B
stones, (10) Y stones, (7) X stones, (2) 6" Angle
cut stones, (1) 8" Angle cut stone, (2) 4"x 7 3/4"
Pyzique veneer cut, (2) 4"x 12"Pyzique veneer
cuts, (1) 6"x12" Maytrx veneer cut, (1) 6"x10"
Maytrx veneer cut, (1) 40" Lintel, (1) 22" Lintel
*Note: Set the 2 Lintels in place making sure the
veneer faces line up with the wall stone faces.
Keeping all lines straight and corners square,
apply concrete adhesive and install wall stones
and cut stones according to the photo.
Cambridge Pre-Packaged / Pre-Cut
MaytRx Outdoor Kitchen Kit (Right Hand)
Pyzique Veneer on Lintel
4"x7 3/4"
4"x 12"
4"x 7 3/4"
MaytRx Veneer on Lintel
(1) 6"x10" & (1) 6"x12"
Capa 6:
Numero de Piezas = (5) esquinas, (5) piedras A, (8)
piedras B, (10) piedras Y, (7) piedras X, (2) 6"
Angulo corte de piedra, (1) 8" Angulo piedras lab-
radas, (2 ) 4"x 7 3/4"Pyzique cortes de chapa, (2)
4"x 12" Pyzique cortes de chapa, (1) 6"x12"
MaytRx trozos de chapa, (1) 6"x10" MaytRx trozos
de chapa (1) 40" Dintel, (1) 22" Dintel
* Nota: Establecer los 2 Dinteles en su lugar
asegurán dose de que la chapa se enfrenta a alin-
earse con la pared de piedra caras.
Mantener todas las líneas rectas y cuadradas es-
quinas, aplicar el adhesivo de hormig n e instalar
las piedras de la pared y cortar las piedras de
acuerdo a la foto.
17
2011

Publicidad

loading