CoolAir RT880, SP950T
7.2.6
Installing supply lines to the condenser unit
(SP950T only)
Observe the following instructions when installing the supply lines:
Also observe the installation instructions for the condenser unit.
The maximum cable length between the evaporator and condenser
unit is 4.20 m (fig. 6, page 6).
When installing and bending supply lines, avoid narrow radii. Use a
suitable round object as a bending aid. A radius which is too narrow
will buckle the refrigerant line, and the parking cooler will be inoper-
able.
➤ Shorten any supply line which is not needed by bending a curve.
➤ Apply packing compound (fig. 7 1, page 6) to prevent water entering
between the rear wall of the truck and the clip.
I
NOTE
If you wish to avoid damaging the rear wall of the truck (drilling a hole),
you can also apply the clip using a suitable adhesive. Observe the
instructions provided by the adhesive manufacturer.
➤ Fasten the supply lines to the rear wall of the truck using the clips
provided (fig. 7, page 6).
➤ Insert the corrugated piping in the holder provided (fig. 7 2, page 6).
➤ Put the cover on (fig. 7 4, page 6).
7.2.7
Fastening the cover frame
A
NOTICE!
Screw the screws in carefully order not to damage the cover frame.
RT880: See fig. 8, page 7
SP950T: See fig. 9, page 8
➤ Fasten the cover frame (6) to the unit with the four cylindrical screws
(Magnum: M6 x 110 mm; Premium: M6 x 100 mm) (8), washers (7),
(SP950T only) washers M6 x 20 x 2 mm (10) and the eight spacer
sleeves (Magnum: two L = 48 mm; Premium: one L = 48 mm and one
L = 40 mm) (5). The spacer sleeves keep the cover frame apart from
the unit.
EN
Installation
47