Use And Maintenance - GRE SF133 Manual De Instrucciones

Barrera de protección para piscinas
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 10
8. INSTALLING THE LOCK HOOKS
When all the holes are drilled and all the panels installed, they need to be connected to one another using the lock hooks
included in the package. To install the hooks, follow these steps:
• Release the superior screw of the poles with the help of a screwdriver and a bit holder (See 1).
• With the hook, screw karabiners to the poles (see 2 and 3).
• To close the hook, follow these steps (see 4).
1. Hold the two poles and put pressure on them to bring them closer together
2. Release the safety latch (the movable piece on one end of the spring)
3. Lower the hook and let go of it

USE AND MAINTENANCE

9. ACCESS TO THE POOL
It is possible to access the pool through each of the panel
connections, by unblocking the safety hooks.
Follow these steps:
• Hold the two poles and put pressure on them to bring
them closer together.
• Release the safety latch (the movable piece on one end
of the spring).
• Lift up the hook to release the connection between the
panels.
• Lift up the pole by turning it.
WARNING: the pole cannot be removed if you simply
pull without turning it at the same time.
IT IS IMPERATIVE THAT ACCESS POINTS ARE CLOSED AT THE END OF THE SEASON OF SUPERVISED
SWIMMING.
10. MAINTENANCE
Try to regularly monitor all barrier components. If any of the components should be damaged, especially those relating
to closing, please contact the shop where you purchased the barrier immediately in order to obtain a replacement part.
It is imperative to replace the elements or groups of elements that are damaged as soon as possible. Do nost use parts
that are not officially approved by the PROVIDER / INSTALLER.

Publicidad

Tabla de contenido
loading

Tabla de contenido