Fairland Inverter-Plus Serie Manual Del Usuario página 29

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Size(mm)
Model
IPHC25
IPHC28
IPHC35
IPHC45
IPHC55
IPHC70
IPHC70T
IPHC100T
※ Above data is subject to modification without notice.
① The frame must be fixed by bolts (M10) to concrete foundation or brackets. The
2.2.2. Heat pump installation.
concrete foundation must be solid; the bracket must be strong enough and anti-rust
② The heat pump needs a water pump (Supplied by the user). The recommended pump
treated;
③ When the heat pump is running, there will be condensation water discharged from the
specification-flux: refer to Technical Parameter, Max. lift ≥10m
bottom, please pay attention to it. Please insert the drainage tube(accessory) into the
hole and clip it well, then connect a pipe to drain off the condensation water.
① Connect to appropriate power supply, the voltage should comply with the rated
2.2.3. Wiring & protecting devices and cable specification
② Well earth the heat pump.
voltage of the products.
③ Wiring must be connected by a professional technician according to the circuit diagram.
④ Set breaker or fuse according to the local code (leakage operating current ≤ 30mA).
⑤ The layout of power cable and signal cable should be orderly and not affecting each
other.
E
B
Name
A
B
324 590 308 349
324 590 308 349
324 590 308 349
404 590 388 429
404 590 388 429
404 720 388 429 1084
404 720 388 429 1084
514 790 498 539 1154
For installers and professionals
C
A
D
C
D
E
894
280
954
340
954
340
954
390
954
460
620
620
650
- 26 -
F
G
H
74
648
74
648
74
648
74
648
74
755
74
948
74
948
74
948

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Iphc25Iphc28Iphc35Iphc45Iphc55Iphc70 ... Mostrar todo

Tabla de contenido