Before You Start; Packing List; Assembly - Yamabiko MTA-3EXT Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Packing list

 The following parts are packed separately in the packing box.
 When you have unpacked the box, please check the parts that it contains.
 Contact your dealer if anything is missing or broken.
1.
3-foot extension
2.
Storage hook assembly

Assembly

 Read the operator's manual carefully to ensure that you assemble the product correctly.
Using a product that has been incorrectly assembled could lead to an accident or serious injury.
3 foot extension installation

Before you start

3.
Operator's manual
WARNING
 Use of more than one extension can result in balance
and control problems leading to possible personal inju-
ry to operator and bystanders and/or unit damage.
1.
Pull locator pin (A) on power source, and turn anticlockwise
1/4 turn to lockout position. Loosen clamping knob (B) and
remove attachment from power source.
2.
Remove hanger assembly from 3 foot extension.
3.
Carefully fit extension drive shaft assembly into power
source coupler (C) to decal assembly line (D), making sure
that the inner lower drive shaft engages into the square up-
per drive shaft socket.
4.
Rotate locator pin on power source coupler (A) 1/4 turn
clockwise to engage drive shaft hole. Insure locator pin is ful-
ly engaged by twisting lower drive shaft. Locator pin should
snap flush in coupler. Full engagement will prevent further
shaft rotation.
5.
Secure extension to coupler by tightening clamping knob
(B).
5
Before you start
WARNIG

Publicidad

Tabla de contenido
loading

Productos relacionados para Yamabiko MTA-3EXT

Tabla de contenido