Maintenance; Service Inspection - Pressalit Care PLUS Serie Instrucciones De Uso

Soporte de lavabo
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 116

Maintenance

Expected service life of the wash basin lifter is 10 years, provided that
maintenance is carried out as described below:
It is recommended on a weekly basis to run the motors on the product to their
maximum positions by raising the product to its full height, and then lowering
it to its lowest position, so that the internal parts are lubricated.
It is recommended that service inspection is done once a year.

Service inspection

Take the wash basin to its highest position.
① Loosen the two top screws
en
14
Disconnect mains before
removing the covers.
.
1
1
② Remove the four screws
holding the front cover.
1

Publicidad

Tabla de contenido
loading

Productos relacionados para Pressalit Care PLUS Serie

Este manual también es adecuado para:

Plus r4750Plus r4751Plus r4752Plus r4780Plus r4781Plus r4782

Tabla de contenido