Descargar Imprimir esta página

Facom 952/95 Guía De Instrucciones página 6

Herramientas para el calado de la bomba de inyección

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 12
1
Contents
Item
Reference
01
950.01
50
950.50
55
950.55
80
950.80
85
950.85
90
950.90
115
82H.3
2
Preparation and assembly
Note : Always refer to the distributor or injection pump supplier manual to
determine the appropriate preparation before attempting to adjust either.
* Whenever work is to be carried out on the distributor or injection pump,
refer to the vehicle manual.
TDC = Top Dead Centre
Caution : Always disconnect the vehicle battery before beginning.
2-1
Dial Indicator 01 and Dial Indicator Extensions 90
Use the dial indicator with its original stylus (t) to take measurements
using adapters 50 - 55. Fit the extension 90 to carry out measurement with
support 80 and sensor 85. Unscrew the original stylus (t) from the dial
indicator 01 and replace with the appropriate extension.
2-2
Short 50 and long 55 Adapters.
Unscrew the inspection port plug (b) on the end of the pump. Thread
in and finger tighten adapter 50 or 55. Fit the dial indicator 01 plus
the original stylus (t). Pre-load (P) and secure (f).
2-3
Support 80 and Feeler Sensor 85.
Unscrew the inspection port plug (b) on the top of the pump. Insert the
sensor 85 in the inspection port, position the support 85 and secure
(using the hex-head key 115) . Fit the dial indicator 01 plus extension
90. Pre-load (P) and secure (f).
Description
Dial indicator
Short adapter
Long adapter
Support
Sensor
Dial indicator extension
3 mm hex key
GB
Qty.
1
1
1
1
1
1
1

Publicidad

loading