Descargar Imprimir esta página

grow 'n up 5085 Manual De Instrucciones página 3

Publicidad

8
STORAGE / RANGEMENT / ALMACENAMIENTO:
SAND FILLING / REMPLISSAGE DE SABLE / RELLENO DE ARENA:
GB • Filling sand into support base for extra stability.
• Filling sand into support base for extra stability.
• Funnel and sand are not included.
• Funnel and sand are not included.
• Llene la base de arena para conseguir mayor estabilidad
• Llene la base de arena para conseguir mayor estabilidad
• Embudo y arena no incluido.
• Embudo y arena no incluido.
CU S TO ME R S ER V I CE / EN QU IR I ES
US/Canada toll free hotline:
1-888-468-9898
service@grow-n-up.com
www.grow-n-up.com
9
E
• Ajoutez du sable dans la base du support pour plus de stabilité
• Ajoutez du sable dans la base du support pour plus de stabilité
• Entonnoir et le sable non inclus.
• Entonnoir et le sable non inclus.
Room 808B New Mandarin Plaza, Tsim Sha Tsui, Kowloon, Hong Kong.
3
CHALKBOARD
TABLEAU NOIR
PIZARRA NEGRA
(OPTIONAL / OPTIONNEL / OPCIONAL)
!
Dry Sand
Sable sec
Arena seca
Wet Sand
Sable humide
Arena húmeda
©2019 Grow'n up Limited.
All Rights Reserved.
MADE IN CHINA (SZ)

Publicidad

loading