Liberty CLOSETS Serie Guia De Instalacion página 15

Tabla de contenido

Publicidad

7
1
A
2
Long vertical sides (B) come pre-assembled with corner couplers in place.
Assemble two long vertical sides (B) with the horizontal top (A) and bottom (C) headers.
Secure the top with screws (AA) and the bottom with levelers (BB).
The first three steps of assembly are completed with the frame laying on its side.
Repeat for an additional frame
Note: Frame sides (B) are the same top-to-bottom and can be installed as either the front or the back of the
frame. The frame header (A) and the Frame Footer (C) are the same front-to-back.
Los lados verticales largos (B) ya vienen ensamblados con los acoples de las esquinas en su lugar.
Ensamble dos lados verticales largos (B) con las cabeceras horizontales superior (A) e inferior (C).
Fije la parte superior con tornillos (AA) y la inferior con niveladores (BB).
Repita para un armazón adicional
Nota: Los lados del armazón (B) son iguales de arriba a abajo y se pueden instalar al frente o atrás del
armazón. La cabecera del armazón (A) y el pie del armazón (C) son iguales al frente y atrás.
Top of frame
Header (A) has 4 holes for
mounting hanging bars
La parte superior de la
cabecera del armazón (A)
tiene 4 agujeros para
montar las barras
colgantes.
AA
B
B
15
1
C
2
BB

Publicidad

Tabla de contenido
loading

Tabla de contenido