Installation Of Top Link; Connection Between Toplink And Hood - THERMEx TOP LINK MODUL III Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

M 536991350901122020

INSTALLATION OF TOP LINK

Top Link
must be connected to the electrical current for the oven or hob. The transmitter is connected in accordance with the diagram

CONNECTION BETWEEN TOPLINK AND HOOD

Once the Top Link is connected, the hood and Top Link must be paired to each other. One hood can be connected to multiple Top Link modules.
The pairing can be carried out in the following way:
1 - Hood
Hold down the button for fan control until all lights blink
five times(around 10 seconds). The hood is now open for
pairing for one minute.
Slider: Hold down "ON/OFF" for 10 seconds. The hood is
now open for pairing for one minute.
N
L1
L2
L3
Power output Power input
Fuse
-
+
Dipswitch
Diode - PWR
ON
DIP
Diode - SET1
1
2
3
4
Button - PAIR
Button - SET LEVEL
N
L1
L2
L3
Click the button next to the battery, as shown on the illus-
tration. The hood will open for pairing for one minute.
Glass Touch panel: Hold down "Timer" for 15 seconds.The
hood will now be open for pairing for one minute.
THERMEX TOP LINK III
47
.

Publicidad

Tabla de contenido
loading

Tabla de contenido