Panasonic ADC0309 Serie Manual De Instalación página 7

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 9
The equipment's Power Supply 2 complies with IEC/EN 61000-3-2.
The equipment's Power Supply 2 complies with IEC/EN 61000-3-11
and shall be connected to suitable supply network, with the following
maximum permissible system impedance Z
Please liaise with supply authority to ensure that the Power Supply 2 is
connected only to a supply of that impedance or less.
5
CHARGING AND
DISCHARGING THE WATER
Make sure all the piping installations are properly done before carry out
below steps.
CHARGE THE WATER
For Domestic Hot Water Tank
1. Set the Domestic Hot Water Tank Discharge
"CLOSE"
Domestic Hot Water Tank Discharge
Set all Tap / Shower "OPEN".
2.
Start fi lling water to the Domestic Hot Water Tank via Tube
3.
i
Connector
.
After 20~40min, water should fl ow out from Tap / Shower.
Else, please contact your local authorized dealer.
Check and make sure no water leaking at the tube connecting
4.
points.
For Space Heating / Cooling
1. Turn the plug on the Air Purge Valve c outlet anticlockwise by one
complete turn from fully closed position.
Air purge valve c
2. Set the Pressure Relief Valve d level "DOWN".
Lever
Turn up
Pressure relief valve d
3. Start fi lling water (with pressure more than 0.1 MPa (1 bar)) to the
Space Heating / Cooling circuit via Tube Connector g. Stop fi lling water
if the free water fl ow through Pressure Relief Valve Drainage
4. Turn ON the Tank Unit and make sure Water Pump 2 is running.
5. Check and make sure no water leaking at the tube connecting points.
DISCHARGE THE WATER
For Domestic Hot Water Tank
1. Turn OFF power supply.
2. Set the Domestic Hot Water Tank Discharge
3. Open Tap / Shower to allow air inlet.
4. After discharge, set Domestic Hot Water Tank Discharge
6
RECONFIRMATION
WARNING
Be sure to switch off all power supply before performing each of the
below checkings.
CHECK WATER PRESSURE
Water pressure should not lower than 0.05 MPa (with inspects the Water
Pressure Gauge f). If necessary add water into Tank Unit (via Tube
Connector g).
= 0.445 at the interface.
max
to "CLOSE".
g
"OPEN"
g
Plug (turn
anticlockwise by
one complete turn)
Pressure relief
valve d
.
h
to "OPEN".
g
to "CLOSE".
g
*(0.1 MPa = 1 bar)
CHECK PRESSURE RELIEF VALVE d
Check for correct operation of Pressure Relief Valve d by turning on
the lever to become horizontal.
If you do not hear a clacking sound (due to water drainage), contact your
local authorized dealer.
Push down the lever after fi nish checking.
In case the water keep on draining out from the Tank Unit, switch off the
system, and then contact your local authorized dealer.
EXPANSION VESSEL b PRE PRESSURE CHECKING
For Space Heating / Cooling
Expansion Vessel b with 10 L air capacity and initial pressure of 1 bar
is installed in this Tank Unit.
Total amount of water in system should be below 200 L.
(Inner volume of Tank Unit's piping is about 5L)
If total amount of water is over 200 L, please add another expansion
vessel. (fi eld supply)
Please keep the installation height difference of system water circuit
within 10 m.
CHECK RCCB/ELCB
Ensure the RCCB/ELCB set to "ON" condition before check RCCB/ELCB.
Turn on the power supply to the Tank Unit.
This testing could only be done when power is supplied to the Tank Unit.
WARNING
Be careful not to touch parts other than RCCB/ELCB test button when the
power is supplied to Tank Unit. Else, electrical shock may happen.
Push the "TEST" button on the RCCB/ELCB. The lever would turn down
and indicate "0", if it functions normal.
Contact authorized dealer if the RCCB/ELCB malfunction.
Turn off the power supply to the Tank Unit.
If RCCB/ELCB functions normal, set the lever to "ON" again after testing
fi nish.
7
TEST RUN
1. Before test run, make sure below items have been checked:-
a) Pipework are properly done.
b) Electric cable connecting work are properly done.
c) Tank Unit is fi lled up with water and trapped air is released.
d) Please turn on the power supply after fi lling the tank until full.
e) In order to check whether the tank is full, switch heater once for about
10 min.
2. Switch ON the power supply of the Tank Unit. Set the Tank Unit RCCB /
ELCB to "ON" condition. Then, please refer to the Operation Instruction
for operation of Control Panel 1.
3. For normal operation, Water Pressure Gauge f reading should be in
between 0.05 MPa and 0.3 MPa. If necessary, adjust the Water Pump
2 SPEED accordingly to obtain normal water pressure operating
range. If adjust Water Pump 2 SPEED cannot solve the problem,
contact your local authorized dealer.
4. After test run, please clean the Water Filter Set 6. Reinstall it after
fi nish cleaning.
SYSTEM CAPACITY RANK SETTING
Before Tank Unit operate, it's Capacity Rank have to match with connected
Outdoor Unit. See below table for detail.
Model
Tank Unit
Outdoor Unit
UD03*E5*
UD05*E5*
ADC0309*
UD07*E5*
UD09*E5*
The Capacity Rank can be set by Control Panel 1
Press SET and SERVICE buttons simultaneously for 5 seconds.
1.
2. Press / button to select menu CAP RAN.
3. Press SELECT button then press / button to change capacity rank
and press SET button to confi rm the outdoor capacity rank.
4. Press CANCEL button and Exit to home display.
Capacity Rank
3
5
7
9
7

Publicidad

Tabla de contenido
loading

Tabla de contenido