Mounting Diagram - Chauvet Scorpion Storm RGB EU Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

International laser safety regulations require that lasers must be operated in the fashion with a
minimum of 3 meters (9.8 ft) of vertical separation between the floor and the lowest laser light vertically.
Additionally, 2.5 meters of horizontal separation is required between laser light and audience or other
public spaces:
CAUTION! Use of control, adjustment, or performance of procedures other than what is specified in this
manual may result in hazardous radiation exposure.
Rigging

Mounting Diagram

Safety Cable
8
Before deciding on a location for the product, always make sure there is easy
access to the product for maintenance and programming/ fluid replenishment
purposes.
Make sure that the structure or surface onto which you are mounting the product
can support the product's weight (see the Technical Specifications).
Any surface the product is being mounted to should be able to support 10 times the
weight for an hour without deforming.
When mounting the product overhead, always use a safety cable. Mount the
product securely to a rigging point, such as an elevated platform or a truss.
When rigging the product onto a truss, you should use a mounting clamp of
appropriate weight capacity.
Mounting Clamp
Scorpion Storm RGB EU User Manual (Rev. 1 ML)
Manual Bracket
Adjustment

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Scorpion scan 300 rgb eu

Tabla de contenido