Preliminary Checks; General Maintenance - Techibel MCV Manual De Instalación

Unidad terminal de pared
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

5 - ACCESSORIES
5.1 - ACTIVATED CARBON AIR FILTER - code 397021909 (MCW1-2) - 397021910 (MCW3-4)
• See "Operating instructions".
5.2 - 3-WAY VALVE + BY-PASS - code 70600071
• The valve is supplied without coupling or tube and is to be installed outside of the unit.
6 - STARTING
Before doing any work on the air conditioner, make sure it is switched off and put out of bounds.
Any work must be carried out by personnel qualifi ed and authorised to work on this type of air conditioner.

6.1 - PRELIMINARY CHECKS

• Make sure:
- that the water circulates correctly in the air handler,
- that the heat exchanger has been purged,
- that the connections are correctly tightened and have good
thermal insulation,
- that there are no leaks,
- that the air handler is well fi xed,
- that the power cables are well fi xed to their connection
terminals,
- that the electric cables are properly insulated from any
pieces of sheet or metal parts which could damage them,
- that the unit is connected to earth,
- that no tools or any other objects have been left in the units
(specially form packing-pieces in the discharge louvers),
7 - MAINTENANCE
Before doing any work on the air conditioner, make sure it is switched off and put out of bounds.
Any work must be carried out by personnel qualifi ed and authorised to work on this type of air conditioner.

GENERAL MAINTENANCE

All equipment must be properly maintained in order to provide optimum performance over time. Faulty maintenance can result in
the cancellation of the product guaranty. Depending on the products, maintenance operations consist in the cleaning of fi lters (air,
water), internal and external exchangers, casings, and the cleaning and protection of condensate tanks. Treating odours and the
disinfection of room surfaces and volumes also contributes to the cleanliness of the air breathed by users.
TECHNIBEL proposes a wide range of perfectly adapted professional cleaning, maintenance and repair products for complete and
effi cient maintenance. For an optimum result, TECHNIBEL air-conditioners must be maintained with TECHNIBEL maintenance
products.
• Air fi lter:
- Clean every two weeks. See "Operating instructions".
• Electric connections:
- Once a year, check that the electric wires are well fastened
to their terminals.
• Electric box:
- Dusting is recommended once a year.
IMPORTANT
- that the fi lter is correctly fi tted,
- that the condensate discharge outlet is correctly
connected,
- that the condensate collection tank is clean.
6.2 - SWITCH ON THE UNIT
• Using the isolation and protection device.
6.3 - STARTING
• See Operation Instruction manual.
IMPORTANT
• Condensate pumping system:
- This requires regular specifi c maintenance.
- The maintenance cycle is determined by the conditions
of operation (minimum operations to be performed each
time the installation is restarted in cooling mode).
- Clean the condensate recovery tray located under the
heat exchanger and check hoses/pipes.
- Clean with water containing 5% bleach.
GB
9

Publicidad

Capítulos

Tabla de contenido
loading

Productos relacionados para Techibel MCV

Tabla de contenido