Johnson Controls YORK YLCA 20 Instrucciones De Instalación página 8

Deposito de inercia de 115 lt
Ocultar thumbs Ver también para YORK YLCA 20:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 1
Wiring of the heater
- Prior to installation, power off the YLHA/
YLHA PLUS units.
- Do not power on again until installation is
finished and with the tank full of water.
AH
-
1 0 . 5 K w b a c k u p h e a t e r
(400.3.50).
BT
- Buffer tank.
EBBT -
Buffer tank connections box.
EBHP -
YLHA/YLHA PLUS connections
box.
Wiring of the heater
���������������
��
��
��
��
���
��
�� ��
��
All data subject to change without notice.
8
K2
-
Q1
-
Installation
N1 - Remove the top cover of the tank.
N2 - Remove the cover of the connections
box.
N3 - Remove the cover of the YLHA/YLHA
PLUS control box.
N4 - Connect terminals 2 and N2 of the
tank connections box to the cor-
����
��
��
����
��
��
� � ��
� � �� �� �� �� �� ��
� � �� �� �� �� �� ��
Heater contactor.
Thermomagnetic protector of the
heater.
��
��
��
��
�������
��
��
����
GB
responding terminals in the YLHA/
YLHA PLUS electrical connections
box.
N5 - Connect terminals 1, 3 and 5 of
contactor K2 and ground of the tank
electric box to the power supply.
For this purpose, use 2.5 mm² Cu
cable and a thermomagnetic 20 amp
switch.
N6 - Pass the cables through the tank the
corresponding drilled holes.
��
��
��

Publicidad

Tabla de contenido
loading

Tabla de contenido