Setup And Operation - Southwire MAXIS XD1 Manual De Instrucciones De Operación Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

SETUP AND OPERATION

MOUNTING DRILL TO PULLER
1. Loosen hand drill chuck to receive Input Shaft (3) of puller.
2. Align handle of hand drill with Adjustable Drill Cradle (2) and
install onto Input Shaft Chuck Adaptor (3) and tighten drill chuck (Fig
1 and 2).
CAUTION: Care should be taken when engaging the drill
motor to tighten onto the pullers Input Shaft Chuck Adapter
(3) as to not pinch fingers from torque of drill.
3. Tighten bolts on Adjustable Drill Slide (7) once it is in contact
with drill handle.
4. Secure drill handle to Adjustable Drill Cradle (2) with supplied
strap.
Fig 1
7
Fig 2
SETUP AND OPERATION
PULLING INSTRUCTIONS (SETUP)
1. When pulling with a polyline/mule tape or rope, two methods of
loading the Capstan (1) can be used.
POLYLINE/MULE TAPE PULL SETUP
A. When pulling underground or from below, make a loop in the
end of the polyline/ mule tape and attach the eye around the
Polyline/Mule Tape Pin (10) on the Capstan (1) (Fig 3). This will
allow the polyline/mule tape to continuously accumulate onto
the Capstan (1) (Fig 4). Switch the 18-Volt drill into REVERSE
and payoff like most conventional wire pullers.
Fig 3
B. When pulling overhead or from above, pull forward pin on
Front Extension (6) and rotate 180 degrees and insert back into
Base Arm (5) and re-install pin (Fig 5 and 6). Make a loop in the
end of the polyline/mule tape and attach the eye around the
Polyline/Mule Tape Pin (10) from underside of the Capstan (1).
This will allow the polyline/mule tape to continuously accumu-
late onto the Capstan (1). Switch the 18-Volt drill into FOR-
WARD and payoff like most conventional wire pullers.
Fig 5
8
Fig 4
Fig 6

Publicidad

Tabla de contenido
loading

Tabla de contenido