PREPARATION
Before beginning assembly of product, make sure all parts are present. Compare parts with package
contents list and hardware contents above. If any part is missing or damaged, do not attempt to
assemble the product. Contact customer service for replacement parts.
Estimated Assembly Time: 15 minutes
Tools Required for Assembly: Phillips Screwdriver (Not Included) and Wrench (Included)
ASSEMBLY INSTRUCTIONS
1. Insert handle (A) into hole in mesh cover (B).
Use wrench (FF) to secure M6 Flange nut (DD) to
the underside of the mesh cover.
Hardware Used
M6 Flange Nut
DD
Wrench
FF
2. Attach ash catcher (G) to fire bowl (F) using
M5 bolt (AA) and M5 nut (BB). Tighten with
EE
wrench (FF) and screwdriver.
Hardware Used
M5x10 Bolt
AA
BB
M5 Nut
FF
Wrench
EE
1
B
x 1
x 1
2
x 1
x 1
x 1
4
A
F
G
DD
AA
BB