Elecro Engineering Escalade Serie Manual De Instalación Y Operación página 6

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 16
Wall mounting:
Fig 5.
Your Elecro Heat Exchanger should be connected to the two
independent water circuits as follows:
1. Connection to Water Filtration Circuit (Secondary)
The heat exchanger should be plumbed inline, after the filtration pump
and filter and before any water treatment equipment. It should be fed
with clean water. Weed / debris should not be allowed to enter the heat
exchanger. The heat exchanger should be installed as close as possible to
the boiler to minimise heat loss.
To assist with correct air purging and to ensure that the heat exchanger
remains full of water during operation, it should be installed at the lowest
point in the filtration circuit.
If the heat exchanger is installed in a vertical plain, it is essential that
the pool/pond water (secondary circuit) enters low and exits high.
4
www.elecro.co.uk

Publicidad

Tabla de contenido
loading

Tabla de contenido