Haverland TE-700I Manual De Instalacion Y Uso página 26

Ocultar thumbs Ver también para TE-700I:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2. INSTALLATION
EN
11
12
TE700I
26
6
7
8
Take the HAVERLAND towel
rail radiator and hang it on the
four supports fixed to the wall.
Place the radiator so that the
upper supports are between
the second and third bars of
the heater.
Fit the four parts 6 to the wall
supports and loosely screw
in the four long screws (part
7). Align the towel rail radiator
using a level and, when
correctly aligned, tighten the
four screws 7.
Adjust the distance of the
radiator from the wall as
required and, when correct,
tighten the screws 5.
Your radiator is now correctly
secured to the wall. Complete
the installation by fitting the
four trims (part 8) to the four
supports.
The mains power cable can
now be connected to the mains
power supply.

Publicidad

Tabla de contenido
loading

Tabla de contenido