Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

SORHEA
3

INSTALLATION

For wall mounted installations, use the provided screws and lag shields.
Drill 4 holes and install the lag shields using the template below:
Screw covers
Open the 4 screw covers
to mount the column.
Removal / Reinstallation of the infrared cover
Unscrew the 2 screws fastening the infrared cover and remove them.
Position the infrared cover on the plate then screw in the two fastening screws.
2 M4 mounting screws
Cable routing in the barrier
Passage of the screw
Cable
(*)
- 21 -
BIRIS II 50
BIRIS II 100
BIRIS II 200
Wire race
1. Break the hole and insert
the cable into the wire
race, leaving some slack.
2. Wire the column.
3. Bring out the cable as
indicated (*).
BIRIS II 50/100/200
X
X
Y
47 mm
315 mm
65 mm
367 mm
65 mm
367 mm

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Biris ii 100Biris ii 200

Tabla de contenido