STEP 2
NOTE: The INSTALL
CHECKLIST screen will appear
with the selection box around
STEP 2 - Include Controller
when NEXT STEP is chosen from
STEP 1.
Press the center button
the VRCPG to bring up the
INCLUDE CNTRLLER screen,
where you will be prompted to
place the controller in program
mode.
NOTE: Leviton Controllers require
an inclusion process that differs
from Dimmers and Switches.
Controllers must be placed into
program mode before they can be included into the
network (refer to individual device instruction
sheet).
Once your controller has been placed in program
mode, press the center button
VRCPG will go through the communication process
and assign the node information for that device. The
TEXT EDITOR will display where you can name your
device (refer to TEXT EDITOR pg. 7).
Once your name is displayed,
press the center button
VRCPG will confirm inclusion
and prompt you to continue to
INCLUDE CONTROLLER by
pressing the center button
to continue to the NEXT STEP
by pressing the right soft key
NOTE: The confirmation process will take some time,
specifically in large networks. Remain close to the
controller until the confirmation is complete. After
including all controllers, proceed to the NEXT STEP.
STEP 3
NOTE: The INSTALL
CHECKLIST screen will appear
with the selection box around
STEP 3 - Update Controller
when NEXT STEP is chosen from
STEP 2.
8
Include Controller
Update Controller
8:35A
INSTALL CHECKLIST
1. Include Dim/Swch
2. Include Controller
3. Update Controller
4. Create Areas
5. Set Associations
Back
on
8:35A
INCLUDE CNTRLLER
Place controller
in program mode
See Instruction sheet
Return
on the VRCPG. The
8:35A
.The
INCLUDE CNTRLLER
Node ID #3:
Room Controller
or
Back
8:35A
INSTALL CHECKLIST
1. Include Dim/Swch
2. Include Controller
3. Update Controller
4. Create Areas
5. Set Associations
Back
x1
Next Step
x1
Begin? Press
x1
Node included!
More? Press
Next Step
x1
Next Step