1.
Provide an opening in the wall 14 1/2" (368 mm) wide and
66 1/4" (168 cm) high measured from top of floor plate (See
Figure 14 and Figure 19). Wall depth is to be 2" x 4" framing
with 1/4" (6.5 mm) to 5/8" (16 mm) sheeting.
66 1/4"
(1683mm)
2.
Install ceiling spacers (not supplied with furnace) according
to manufacturer's instructions.
23813-1-0807
ROUGH-IN INSTRUCTIONS
14 ½"
(368mm)
Figure 14
Figure 15
3. Attach baseplate (not supplied with furnace) to header plate
with sheet metal screws at each end.
HEADER ASSEMBLY
4. Attach 4" (102mm) oval, double wall vent pipe to baseplate.
BASE PLATE
Figure 16
OVAL PIPE
BASE PLATE
Figure 17
GASKET
Page 11