4 INSTALLATION
4.1 UNIT INSTALLATION
Use the installation guidelines as a reference only.
4.2 GENERAL DUCT WORK INSTALLATION
for more information.
•
•
•
•
•
Install dry air out duct/channel at a high level.
•
•
•
•
•
•
4.3 HUMIDISTAT/ELECTRONIC CONTROLLER INSTALLATION
Install the humidistat/electronic controller away from the dry air out path to avoid false readings.
4.4 ELECTRICAL CONNECTION
Electrical components should be connected to the supply according to the local regulations and requirements.
4.4.1 POWER SUPPLY
The single-phase cable is to be directly connected to the power grid with earthing capability.
See electrical diagram for a electrical voltage and operation frequency.