TO REASSEMBLE -
REFER TO THE ACCOMPANYING EXPLODED DIAGRAM TO IDENTIFY PARTS AND TO HELP IN
ASSEMBLY. BLACK DOTS ON THE PLASTIC PARTS INDICATE THE FRONT SIDE.
1. ASSEMBLE THE LEGS, LEG BRACES, LEG PADS AND LEG GLIDES AS SHOWN IN THE
EXPLODED DIAGRAM. BE SURE TO FOLLOW THE PROPER ORIENTATION.
2. SLIDE THE LEGS INTO THE BLADE HOLDER FRAME. REFER TO THE EXPLODED DIAGRAM
FOR THE PROPER ORIENTATION OF THESE PARTS.
3. SET THE PUSHER PLATE ON TOP OF THE BLADE HOLDER FRAME ALIGNED SO THE
THROUGH HOLES FOR THE UPRIGHT HANDLE MATCH UP AND THE LABELS ON THE PUSHER PLATE READ
FROM THE FRONT. (MAKE SURE THAT BOTH DOWN LINK ASSEMBLIES
ARE IN PLACE ON THE PUSHER PLATE)
4. INSERT THE UPRIGHT HANDLE THROUGH THE PUSHER PLATE , BLADE HOLDER
FRAME AND THE LEGS. BE SURE TO PUSH IT IN ALL THE WAY.
5. INSTALL THE SPRINGS. THE STRAIGHT END OF THE SPRING GOES AGAINST THE BLADE HOLDER
FRAME WITH THE END INSERTED INTO THE HOLE IN THE BLADE
HOLDER FRAME MARKED .PLACE SPRING IN HOLE.. THE SPRING COIL FITS OVER
THE FOUR SIDED KNOB ON THE BLADE HOLDER FRAME. REFER TO THE EXPLODED
DIAGRAM FOR RIGHT AND LEFT HAND SPRING PLACEMENT.
6. SLIDE THE PUSHER PLATE UP ON THE UPRIGHT HANDLE AND LAY THE UNIT ON ITS
BACK.
7. INSERT BOTH PIVOT PINS HALFWAY INTO THE HOLES IN THE BLADE HOLDER FRAME.
8. PUT THE .P. PIN BRACKETS IN PLACE WITH THE SINGLE LARGE HOLE FITTING OVER
THE TO STUD ON THE CORRESPONDING LEG BRACE AND THE TWO SMALLER INLINE
HOLES ALIGNING WITH THE HOLE IN THE BLADE FRAME HOLDER FOR THE PIVOT PIN.
DO NOT PUSH THE PIVOT PIN THROUGH THE .P. PIN BRACKET UNTIL STEP 9.
9. PLACE THE HANDLE LEVER ASSEMBLY SO THE HOLES NEAR ITS ENDS LINE UP WITH
THE HOLES IN THE BLADE FRAME HOLDER FOR THE PIVOT PINS AND THE TWO
INLINE HOLES IN THE .P. PIN BRACKETS. PUSH THE PIVOT PINS THROUGH THE .P.
PIN BRACKET AND HANDLE LEVER ASSEMBLY AND INSERT THE .P. PIN THROUGH
THE HOLE IN THE END OF THE PIVOT PIN. SEE THE EXPLODED DIAGRAM FOR
PROPER ORIENTATION OF THE HANDLE LEVER ASSEMBLY.
10. POSITION THE DOWN LINK ASSEMBLIES AND HANDLE LEVER ASSEMBLY SO THAT
WITH A SLIGHT INWARD PRESSURE APPLIED TO THE FREE END OF THE DOWN LINK
ASSEMBLY, THE BUSHING WILL FIT OVER THE STUD ON THE HANDLE LEVER ASSEMBLY.
SEE THE EXPLODED DIAGRAM FOR PROPER ORIENTATION.
11. RETURN THE UNIT TO ITS UPRIGHT POSITION.
12. ENGAGE THE SPRING TENSION. WITH THE HANDLE LEVER ASSEMBLY AND PUSHER
PLATE IN THE UPRIGHT POSITION, GRASP THE SPRING BY THE TRIANGULAR END AND
ROTATE IT UNTIL IT CATCHES THE KNOB ON THE HANDLE LEVER ASSEMBLY. REPEAT
FOR BOTH SPRINGS.
13. INSTALL THE KNIFE ASSEMBLIES AND SLIDE THE BLADE RETAINERS ON TO HOLD THEM
IN PLACE.
4
Searchable, web-optimized PDF created using a watermarked evaluation copy of CVISION Maestro