Commissioning and maintenance
Start-up by turning all ball valves to the operating posi-
tion. Close all flushing and filling valves and turn caps.
Setting the volume flow.
For further information see separate manual and
www.sonnenkraft.com
Pressure loss and residual delivery
head
RLGHE with solar pump PM2 15-105
Solar pump PM2 15-105
Residual delivery head
Pressure loss RLGHE
RLGHE with solar pump Yonos Para 15/7.0 PWM2
Solar pump Yonos Para15/7.0 PWM2
Residual delivery head
Pressure loss RLGHE
GB
25