Descargar Imprimir esta página

Publicidad

Idiomas disponibles

Idiomas disponibles

Enlaces rápidos

LIEBERT® ITA2™ MBC
Quick Installation Guide
IMPORTANT: Before installing,
connecting to supply, or operating
your Liebert ITA2 MBC, please
review the Safety and Regulatory
Statements sheet. For detailed
installation, operating, maintenance
and troubleshooting information
visit the ITA2 product page for the
ITA2 MBC Installer/User Guide
available at www. V ertivCo.com or
use the QR code below.
Table 1 Liebert ITA2 MBC currents and cables — User and UPS rectifier input
Maximum Input
Unit Rating
Current (A)
8 KVA
10 KVA
Table 2 Liebert ITA2 MBC currents and cables — User and UPS bypass input and output
Maximum Input
Unit Rating
Current (A)
8 KVA
10 KVA
Table 3 Recommended lug sizes
McMaster-Carr: 7113K462
Part Number
Thomas & Betts: RC10-14
Tyco Electronics: 1577648-1
Unpacking and Inspection
Unpack and inspect the UPS and
its accessories. If damage is visible,
do not proceed. File a damage
claim with the carrier immediately
and send a copy to:
Vertiv Corporation
1050 Dearborn Drive
P.O. Box 29186
Columbus, Ohio 43085 USA
Selecting Power Cables
NOTE: Before connecting the
cables between the MBC and UPS,
make sure that all the circuit
breakers on the MBC front panel
are open. Ensure that the feeder
breakers are open, locked, and
tagged to prevent inadvertent
operation by unauthorized
personnel.
When connecting wiring, follow the
local wiring regulations, and take
the environment situation into
account.
Recommended
OPD
24
30 A
37
50 A
Recommended
OPD
23
30 A
28
40 A
10 AWG (5.26 mm
)
2
75°C THW
75°C THW
Copper Wire
Copper Wire
(phase)
(neutral)
*Number of Cable
* Number of Cable:1
per phase:1
8 AWG
8 AWG
6AWG
6 AWG
75°C THW
75°C THW
Copper Wire
Copper Wire
(phase)
(neutral)
10 AWG
10 AWG
8 AWG
8 AWG
8 AWG (8.36 mm
)
2
McMaster-Carr: 7113K444
Thomas & Betts: RDV717
Tyco Electronics: 132331-1
NOTE: The conduit size and wiring
method must be in accordance
with all local, regional, and national
codes and regulations, including
NEC ANSI/NFPA 70.
The maximum current for operating
modes, the recommended wire
sizes, and the recommended power
cables and plugs are listed in Tables
1 to 3, below.
CONNECTING MBC
INPUT-POWER CABLES
Prepare for connection by
removing the conduit box from the
MBC, opening knockout holes, and
routing cables through the conduit.
Single-input Connection
to the MBC
NOTE: Copper shorting busbars
are factory-installed between rA
and bA; rB and bB; rC and bC;
and N
1. Leave the shorting busbars in
place on the MBC main-input
terminal block.
75°C THW
Copper Wire
Recommended
(Ground)
* Number of Cable: 1
10 AWG
10 AWG
75°C THW
Recommended
Copper Wire
(Ground)
10 AWG
10 AWG
9 AWG (13.3 mm
McMaster-Carr: 7113K366
Thomas & Betts: RE6-14
590-2144-665A/SL-26256QS_REV2
Torque
30 lb-in
30 lb-in
Torque
30 lb-in
30 lb-in
)
2
1

Publicidad

loading

Resumen de contenidos para Vertiv LIEBERT ITA2 MBC

  • Página 1 30 lb-in 10 KVA 50 A 6AWG 6 AWG 10 AWG 30 lb-in Table 2 Liebert ITA2 MBC currents and cables — User and UPS bypass input and output 75°C THW 75°C THW 75°C THW Recommended Recommended Maximum Input Unit Rating...
  • Página 2 LIEBERT® ITA2™ MBC Quick Installation Guide MBC Terminal Blocks MBC Main Input UPS Input rC bC bB rB bA rA bA MBC Main Output UPS Output • Phase B to bB “UPS Input terminal block” to 2. Referring to MBC Main Input the UPS: “Input terminal block:”...
  • Página 3 LIEBERT® ITA2™ MBC Quick Installation Guide UPS Terminal Blocks Output terminal block Input terminal block BAT- BAT+ BATN Communication Connections to Dual-input UPS Bypass 1. Remove the shorting busbars between Terminals rA – bA, rB – bB and rC – bC of the UPS input terminals. Referring to the MBC Terminal Blocks illustration on the previous page, and the UPS...
  • Página 4 To contact Vertiv Technical Support: visit www.VertivCo.com © 2019 Vertiv Co. All rights reserved. Vertiv and the Vertiv logo are trademarks or registered trademarks of Vertiv Co. All other names and logos referred to are trade names, trademarks or registered trademarks of their respective owners. While every precaution has been taken to ensure accuracy and completeness herein, Vertiv Co. assumes no responsibility, and disclaims all liability, for damages resulting from use of this information or for any errors or omissions.
  • Página 5 NEC ANSI/NFPA 70. transportista y envíe una copia a: funcionamiento, mantenimiento La corriente máxima para los modos Vertiv Corporation y solución de problemas, visite la de funcionamiento, los tamaños 1050 Dearborn Drive página del producto ITA2 para recomendados de los cables, y los Código postal 29186...
  • Página 6 MBC LIEBERT® ITA2™ Guía de instalación rápida Bloques de terminales del MBC Entrada principal del Entrada del UPS rC bC bB rB bA rA bA Salida principal del MBC Salida del UPS 3. Para la entrada de la derivación, ilustración Bloques de terminales 1.
  • Página 7 MBC LIEBERT® ITA2™ Guía de instalación rápida Bloques de terminales del UPS Bloque de terminales de salida Bloque de terminales de entrada BAT- BAT+ BATN puesta a tierra PE (junto a pA Conexiones de comunicación en la salida del UPS) MBC a la derivación del UPS de entrada doble 1.
  • Página 8 Para ponerse en contacto con el servicio de asistencia técnica de Vertiv, visite www.VertivCo.com. © 2019 Vertiv Co. Todos los derechos reservados. Vertiv y el logotipo de Vertiv son marcas comerciales o marcas registradas de Vertiv Co. Todos los demás nombres o logotipos mencionados son marcas comerciales o registradas de sus respectivos propietarios.
  • Página 9: Déballage Et Inspection

    Guide d’installation et une copie à : régionaux et nationaux en vigueur, d’utilisation du MBC ITA2 disponible notamment NEC ANSI/NFPA 70. Vertiv Corporation sur le site www. V ertivCo.com ou 1050 Dearborn Drive Le courant maximal pour les utilisez le code QR ci-dessous.
  • Página 10 MBC LIEBERT ITA2 Guide d’installation rapide Blocs de raccordement du MBC Entrée principale du MBC Entrée de l’ASC rC bC bB rB bA rA bA Sortie principale du Sortie de l’ASC Connexion à entrée unique • Neutre à N 2. En vous reportant à la figure Blocs au MBC de raccordement du MBC •...
  • Página 11 MBC LIEBERT ITA2 Guide d’installation rapide Blocs de raccordement de l’ASC Bloc de raccordement de sortie Bloc de raccordement d’entrée BAT- BAT+ BATN • Terre de la barre omnibus PE à la borne de mise à la terre PE (à Connexions de communication côté...
  • Página 12 Pour contacter l’équipe d’assistance technique de Vertiv, consultez le site www.VertivCo.com. © 2019 Vertiv Co. Tous droits réservés. Vertiv et le logo Vertiv sont des marques de commerce ou des marques déposées de Vertiv Co. Tous les autres noms et logos mentionnés sont des noms commerciaux, des marques de commerce ou des marques déposées de leurs détenteurs respectifs.