Terminator
9.
Mount junction box base on expediter. Make
sure to align slots to properly orient junction
box base. Tighten nut with Terminator-LN-
Tool. If mounting horizontally, threaded gland
holes must face downward.
12.
Install thermostat and complete system wiring.
Terminal set screws shall be tightened to a
torque value of 1.4 Nm (12.4 lb-in). See Step
13 for wiring details. Set thermostat at desired
setpoint.
15.
Use screwdriver to ratchet on junction box lid.
Lid will rotate 30 degrees. To remove lid, repeat
steps 14 and 15 but in the opposite direction.
ZT-P-WP
TM
10.
Remove M25 dust cap. Install M25 power
gland (order separately) and M25 blind plug.
Heat Trace #1
PE
13.
Wiring Details: Thermostat Connection
(1 or 2 Heating Cables)
IP66
-45°C Ta + 55°C
PN 27656
0539
II 2 G & D EEx ed II C T5
DEMKO 02ATEX132552X
16.
Fix thermostat bulb and capillary tube to pipe.
INSTALLATION PROCEDURES
Heat Trace #2
N
N
2
2
4 L1
PE
Power Supply
L1
N
PE
PN 27656
11.
Install power cable.
14.
Install junction box lid and twist hand tight.
Insert screwdriver into ratchet slots located
on side of junction box base.
PN 27656
17.
Install IEK insulation entry kit to seal heating
cable penetration through insulation cladding.
IP66
-45°C Ta + 55°C
PN 27656
0539
II 2 G & D EEx ed II C T5
DEMKO 02ATEX132552X