Start Up; Attaching The Accessories; Operation; Temperature Display - Tornado DE 4002 Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

13 Indicator lamp - heating (yellow)
14 Switch - heating (ON/OFF)
15 Switch - steam supply
16 Indicator lamp - water shortage steam
boiler (red)
17 Safety lock
18 Container closure
19 Funnel inlet
20 Extension tubes (two tubes)
21 Detail nozzle (7.1 in/180 mm)
22 Round brush
23 Extension piece
24 Power nozzle (red)
25 Hand nozzle
26 Terry cloth cover
27 Window nozzle (option)
28 Floor nozzle
29 Terry floor cloth
30 Iron (option)
31 Temperature controller
32 Switch - steam ironing
33 Indicator lamp - steam iron heating
34 Support of extension pipe
35 Floor nozzle holder
36 Detail nozzle (4.7 in/120 mm)

Start up

Attaching the Accessories

 Tightly insert the steam plug into the ap-
pliance. The pins of the plug must lock
into the cover of the appliance connec-
tor.
 Connect the required accessories (floor
nozzle, hand nozzle or detail nozzle) to
the steam gun. Slide the parts together
until the locking button locks into the
steam gun.
 Use the extension pipes if necessary.
Slide the parts together until the respec-
tive locking button locks into place.
 Press down on the locking knob to sep-
arate the accessories.
Fill up with water
 Remove the safety cap from the device.
 Fill the boiler with a maximum of 0.5 gal
(2 liters) of fresh tap water using the fill-
ing funnel. You can cut down the heat-
ing-up time by using warm water.
Note
The boiler can be filled up to 0.8 in (2 cm)
below the edge of the filler neck if the appli-
ance is in horizontal position.
Warning
Do not use detergent.
 Screw the safety cap back onto the de-
vice.
Additional tank
The additional tank can be filled if the work
will last for an extended period of time.
 Unscrew the container lid from the addi-
tional tank.
 Fill the additional tank with a maximum
of 0.5 gal (2 liters) of fresh tap water us-
ing the filling funnel.
 Screw the container lid onto the addi-
tional tank.

Temperature display

The temperature display shows whether
the operation is taking place in the correct
temperature range (green range).
Turning on the Appliance
 Insert the mains plug into the socket.
 Switch on the appliance by means of
the switch for steam supply and the
heating switch. The indicator lamps illu-
minate.
Note
The full heating performance is only availa-
ble if the steam plug is connected to the ap-
pliance during the heating-up period.
Once the indicator lamp "heating" has gone
out, the system is ready for use.
– 4
EN

Operation

9

Publicidad

Tabla de contenido
loading

Tabla de contenido