IMPORTANT:
Always maintain 36-3/4" minimum height from the floor to the cutout in any single or
combined installation unless plastic trim is installed.
PREPARE THE OPENING
The Advantium/Convection 120 can be installed
in combination with other GE Appliances/
Monogram appliances. Always follow each
product's Installation Instructions to complete the
installation.
Single Advantium/Convection 120
Installation:
Order a 30" wide single oven cabinet or cut the
opening in a wall to the dimensions shown.
30"
17-1/2"
36-3/4"
Min.
• Allow 1-1/4" case trim overlap
at the top and 7/8" overlap on the bottom and
2-1/4" overlap for each side of the opening.
• Oven overlaps will conceal cut edges on all
sides of the opening.
When installed over a single oven or a
warming drawer, allow at least 2" between
the two openings. This separation will provide
clearance for bottom overlap of the Advantium/
Convection 120 and the other appliance
overlaps.
• The support must be level and rigidly mounted,
flush with the bottom edge of the cutout.
Standard Installation Preparation
23-1/2"
25-1/4"
Construct
solid bottom
- Min. 3/8"
plywood
supported
on all four
sides. Must
be able to
support
weight of
oven and
contents.
PREPARE THE OPENING
Installation over a GE Appliances/
Monogram Warming Drawer:
30"
17-1/2"
36-3/4"
Min.
NOTE: Additional clearances between the cutouts
may be required. Check to be sure the oven
supports above the Warming Drawer location does
not obstruct the required interior depth and height.
See Warming Drawer installation instructions for
details.
5
(CONT.)
23-1/2"
Construct
solid bottom
- Min. 3/8"
plywood
supported
on all four
25-1/4"
sides. Must be
able to support
weight of oven
and contents.
2" Min.
(3" Recommended
Per Warming
Drawer
Requirement
)