ANAESTIVAC 1 & 2 –
For information purposes, the table below gives the amounts of heat that must be extracted, according to the
installed capacity in kW
Total
installed
Heat released
capacity
kW
kW/h
kJ/h
Th/h
5
5.22
18792
10
10.45
37620
15
15.67
56512
12.9
20
20.90
75240
17.2
25
26.12
94032
21.5
30
31.35
112860
25.8
The person in charge of the installation has overall responsibility of the product environment requirements.
He is also in charge of setting up methods of struggle against fire and to protect vacuum units against shocks,
flooding, earthquake and corrosion.
The technician or exploiting is responsible for building construction and civil engineering infrastructures or
earthwork.
Outdoor deadline pressure (snow, wind, rain...) must be taken into account.
Environmental constraints must be managed.
According to the standards NFS99-175 (§ 5-7-3), ISO 10083, ISO 7396-1 (§ 5-8) vacuum units must not be in the
same room as O
concentrator, gas bottles and non-cryogenic liquid.
2
4.

OUTLINE DIAGRAM

 See Annex
5.

INSTALLATIONS

5.1. Dimensions

 See Annex

5.2. Installation

Install your unit on a horizontal surface and fix it to the ground. The turbine is already mounted on its base
using silentblocks to limit the transfer of vibrations.
Keep sufficient space around the plant in case of maintenance work.

5.3. Power supply (see electrical circuit diagram attached)

Power supply must be removed prior to any intervention on the station.
Connection to the power supply must be carried out by the exploiting.
 Refer to the motors or stations rating plates in order to insure that the voltage used on site is that required
by the equipment.
 Use a power cord having conductor section capable of supporting the total combined power of all the
motors in the station (see table below), to the L1 – L2 – L3 – N + Earth terminals for the ANAESTIVAC 2
station and directly to the master switch for the ANAESTIVAC 1 station.
516962-12
Automatic pressure controlled / Automatic vacuum relief valve P.I.D
Ventilation of room
Ventilation
Air inlet area
flow rate
of 3 m/s
kCal/h
m³/h
4.3
4300
1440
8.6
8600
2880
12900
4320
17200
5760
21500
7200
25800
8640
Make sure that the mains power supply voltage and frequency match the ratings shown on the identification
plate.
Power cables must be protected upstream using a surge protection device in accordance with
current legislation and standards of your country.
2
Check all the electrical connections and tighten if necessary before switching on the system
(m
)
0.14
Turbine 3-ph 400V 50 Hz
0.28
Power per turbine (kW)
0.42
Line intensity (A)
0.56
0.7
Cable section (mm²)
0.84
Protection to be fitted (A)
Cable section (mm²)
Protection to be fitted (A)
The wire sections are given for information to 5A / mm
Even so, the sections shall be defined by taking contacts with the wire provider.
They depend:
 of the wire type
 of the length
 of the room temperature
 of the wire path
Alarm report
The connection between Alarm report on automate units must be done by the person in charge of the
installation.
He must control the compliance wiring and proper operation during the final acceptance test.

5.4. Suction/exhaust connections

 Connect the control unit to the network via a flexible hose. The hose section must be at least the same as
the suction intake.
 Collect the discharge hose(s) outside the room. At a minimum, respect the total of the sections of the
turbine discharges.
In accordance with the requirements of §11.13 of the NF EN ISO 7396-2 standard, the anaesthesia gas discharge
must be channeled to the outside. The location of the discharge point must be such that it avoids any risk of
contamination of occupied buildings, air intakes from compressed air systems, ventilation systems, etc. In
addition, the discharge point shouldn't be near hot surfaces or heat sources.
Measures must be taken to prevent insects or particulate matter from entering the pipes.
6.

COMMISSIONING

 Switch the On/Off button(s) to Off.
 Turn the master switch to I (On): the green "power on" light will come on.
Y 006 V
Y 011 V
Y 020 V
Y 030 V
0.38
0.9
1.5
2.2
1.1
2.5
4.3
5.7
For 1 turbine (ANAESTIVAC 1)
1
1.5
1.5
2.5
4
6
10
For 2 turbines (ANAESTIVAC 2)
1.5
2.5
4
6
10
16
2
.
X06 B2
5.5
11.3
2.5
16
20
4
6
25
32
11