Controls; How To Prepare The Machine For Operation - Amano Pioneer Eclipse FM1700 Manual Del Usuario

Ocultar thumbs Ver también para Pioneer Eclipse FM1700:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Section - A
Start / Stop Levers (see Figure 1).
The Start/Stop levers are under the handle grips.
Interlock Switch (see Figure 2).
The interlock switch is on the handle assembly under
the Start/Stop levers.
Figure 2
Locking Lever (see Figure 3).
The locking lever is on the bottom of the handle
assembly at the back of the machine.
Apply
Pressure to
Lock
Figure 3

Controls

Figure 1

How to Prepare the Machine for Operation

WARNING: Always remove the electrical plug from
the electrical outlet before installing or removing a
brush or accessory.
To connect a brush or pad driver, follow this procedure:
1. Put the handle in the vertical position.
2. To fasten the handle, press down on the locking
lever.
3. Put the handle on the floor.
4. Put one foot on each side of the machine (see
Figure 4).
5. Fit the lugs on the bottom of the machine into the
openings in the brush.
6. Turn the brush or accessory counter-clockwise to
lock it into position.
7. Turn the brush or accessory clockwise to unlock
and remove the brush or accessory.
Figure 4
8. Lift the machine to the vertical position.
NOTE: To prevent damage to the brush or pad driver,
remove the accessory while not in use.
NOTE: To connect a solution tank, follow the
instructions given with the tank.
6
English - EN
Install
Remove

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pioneer eclipse fm2000

Tabla de contenido