Emergency Lowering - Germany Motions TWINMOT T5 Instrucciones De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Installation instructions for engine
swap:
• If the engine is not in the correct position for the
installation, connect the plug and press the button 6
on the hand switch. The motor will move into position
for installation.
• For security reasons again pull the plug from the
socket. For an easy installation, place the bed frame
upside down so the steel pipes face upwards. Now
fi rmly press the engine through the nail-shaped
projections until the tubes remain in the "u" form gap.
• Make sure the symbol for the back on the engine
shows to the head of the bed frame. At the T5 the
holes in the top of the engine are closed on the
tubes with sliding covers, which fi t into the center
of the slot.
• After completing the installation, check that the
remote cable is properly plugged in and is strain-re-
lieved (see drawing). Now place the slatted frame on
the bed frame and connect the plug, so the internal
energy storage can recharge itself.
• Then place the battery.

Emergency lowering:

So you can leave the slatted frame in a reclining po-
sition at power failure, the bed has special equipment
connected to an integrated of 9-V alkaline battery,
which is automatically activated when pressing the
button 6. If the hand switch fails, the "coding" button
can be pressed on the engine. The download speed
is reduced. Although the battery can hold several
emergency descents, we recommend changing after
each descent, or after a maximum of three years, due
to the deterioration of the same.
TWINMOT
Hand switch (functions):
1 – Back part up
2 – Back part down
3 – Foot part up
4 – Foot part down
5 – Foot and back part up
6 – Foot and back part down
7 – Light
8 – Light led
1
3
5
Synchronization:
Hand switch with the motor: Press the button
"coding" on the motor and the 2, 3 and 6 buttons
all at once. A sound will be heard confi rming
synchronization.
Hand switch with two engines: press the button
"coding" located in each of the two
motors and buttons 2, 3 and 6 all at
once. A sound will be heard in both
engines confi rming synchronization.
Technical data:
Connecting power supply 110-240 Volt AC 50/60 Hz.
The engine works with a DC voltage of 24 V DC.
Maximum connection time 15% with continuous
operation is 2 minutes.
Operating voltage for the hand switch is 24 V DC.
Power required, depending on load and models:
30-300 W.
Operating voltage for the hand switch is 24 V DC.
Power required, depending on load and models:
30-300 W.
T5
8
2
4
6
7
- 7-

Publicidad

Tabla de contenido
loading

Productos relacionados para Germany Motions TWINMOT T5

Tabla de contenido