Descargar Imprimir esta página

Grohe Ladylux Pro 30 026 Manual De Instrucciones página 4

Ocultar thumbs Ver también para Ladylux Pro 30 026:

Publicidad

Idiomas disponibles

Idiomas disponibles

Application
Pillar tap usefull for:
• directly connection to cold water supply
• connection to outflow of mixed water supply
Specifications
• Max. flow
• Flow pressure
- min.
- recommended
- greater than 72.5 psi, fit pressure reducing valve
Max. operating pressure
• Test pressure
Installation
Flush piping system prior and after installation of faucet
thoroughly!
Installation and connection, see fig. [1].
Refer to the dimensional drawing on page 1.
Open water supply and check connections for leakage!
1
3
English
8.3 L/min or 2.2 gpm/60 psi
7.25 psi
14.5 - 72.5 psi
145 psi
232 psi
Maintenance
Inspect and clean all parts, replace as necessary and grease
with special grease.
Shut off water supply!
I. Replacing the cartridge, see fig. [2].
1. Pull off shut-off knob (A).
2. Loosen screw (B) and pull off snap insert (C).
3. Pull off sleeve (D).
4. Unscrew cartridge (E) by using a 17mm socket wrench and
remove O-ring (F).
5. Change complete cartridge (E) or O-ring (E1) and reinstall
O-ring (F).
II. Flow regulator, see page 2.
Unscrew and clean flow regulator (13 935).
Assemble in reverse order.
Observe the correct installation position!
Replacement parts, see page 2 ( * = special accessories).
Care
Instructions for care of this faucet will be found in the Limited
Warranty supplement.
2
F
E
E1
A
B
C
D
F

Publicidad

loading