Ensamble el cortinero
Atornille los niples aproximadamente 1/2" (1,3 cm) dentro del extremo roscado de
cada cortinero curvo.
Fije la varilla recta a los niples instalados para conectar todas las tres varillas
juntas. Tenga cuidado de no rayar la superficie de las varillas.
2.
Locate the Flange Holes
K-821 = 46-1/2" (118.1 cm)
K-824 = 42-1/2" (108 cm)
K-821 =
42-1/2" (108 cm)
K-824 =
46-1/2" (118.1 cm)
Finished Wall
Mur fini
Pared acabada
IMPORTANT! The curtain rod must be mounted to stud framing supports.
NOTE: The curved parts of the curtain rod are not equal length. Determine which
wall will have the longer measurement based on your bath model.
From the top deck of the bath, measure the vertical centerpoint of each flange and
mark.
Recommended distance from the top deck is 62-1/2" (158.8 cm) to attain a total
height of 76-1/2" (194.3 cm) from the bottom of the bath basin.
Measure 1-1/2" (3.8 cm) to each side of the centerpoints and mark the location for
the flange holes. Verify that the hole locations are level and are over a stud or
support frame.
Drill a hole at each mark.
Repérer les orifices à bride
IMPORTANT! La tringle à rideau doit être montée sur des supports de cadres à
montants.
Kohler Co.
Finished Wall
Mur fini
Pared acabada
Mark Height.
Marquer la
hauteur.
Marque la altura.
Bath Deck
Comptoir arrière
Cubierta de bañera
Basin Bottom
Fond de la cuvette
Fondo
5
Finished Wall
Mur fini
Pared acabada
62-1/2"
(158.8 cm)
76-1/2"
(194.3 cm)
105286-2-A