1
INSTALL SWEAT SOLDER ADAPTER; Fig. 3
Turn off hot and cold water
CAUTION
supplies before beginning.
Note: Install Optional Sweat Solder Adapter (Supplied)
for copper pipe supply line. Fig. 3.
1. Measure the distance (A) from the finished wall to the
center of the inlet spud on the fixture.
2. Cut the supply pipe 1-1/4" (A-B=C) shorter then the
measurement taken in Step 1. File any rough edges off the
end of the supply pipe.
3. Clean the end of the supply pipe. Push the threaded
Adapter on until it is seated against the internal stop.
Sweat the Adapter to the pipe.
2
INSTALL COVER TUBE, WALL
ESCUTCHEON and SUPPLY STOP; Fig. 4
1. Measure from finished wall to first thread of Adapter or
threaded supply pipe (dimension "X"). Cut COVER
TUBE (1) to length (X). Apply Teflon Tape to the threaded
end of the Adapter or supply pipe. Fig. 4a.
2. Push the COVER TUBE (1) into the WALL
ESCUTCHEON (2). Slide both onto the SUPPLY PIPE (3).
Fig. 4b.
3. Push the COVER TUBE (1) in to expose the threads of the
supply pipe. Fig. 4c. With a wrench thread the SUPPLY
STOP (4) onto the SUPPLY PIPE (3). Align and tighten.
Fig. 4c.
4. Pull COVER TUBE (1) against SUPPLY STOP (4) and push
WALL ESCUTCHEON (2) against finished wall.
3
INSTALL VACUUM BREAKER TUBE; Fig. 5
1. Place the SPUD FLANGE (1) over the spud on the Fixture.
2. Place FRICTION WASHER (3) and SEAL WASHER (4)
inside SPUD COUPLING NUT (2) and thread onto Spud.
Do not tighten fully.
3. Insert the VACUUM BREAKER TUBE (5) or (5a) into the
SPUD COUPLING NUT (2) and push it down.
Note: If cutting VACUUM BREAKER TUBE (5) to size, note
that Critical Line (C/L) on Vacuum Breaker must
typically be 6" (152mm) above fixture. Consult Code
for details.
Fig.3
FILE EDGES
Fig. 4
Fig. 4a
Fig. 4b
Fig. 4c
Fig. 5
5a
5a
2
1
4
Fig.3a
FINISHED WALL
CENTER LINE OF
FIXTURE SPUD
A
(A-B)=
B
C
32mm
(1-1/4)
CLEAN
ADAPTER
SOLDER
ADAPTER
FINISHED WALL
X
TEFLON TAPE
3
2
X
1
3
4
1-1/2" TOP SPUD
M965874 Rev. 1.1 (1/19)
2
1
4