Eaton Quadcast LED Instrucciones De Instalación página 2

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Instructions - Quadcast LED
INSTALLATION
Do not remove LED optical panels, wet location
N
ote:
grommets, or flexible cord glands.
Tools Required:
Phillips tip screwdriver, electrical wiring tools, 9/64" Allen®
Head Key, wet location UL Listed wiring connectors,
UL Listed wet location junction box (For pendant mount
applications).
Alignment Guide (Parking Garage Installation):
Align quick mount plate to junction box by aligning arrows
with parking garage driving lanes (Figure 3). Direction of
arrows should be in line with direction of traffic.
Ceiling/Junction Box Installation:
1.
Loosen (do not remove) the two locking screws
(Figure 1). Pivot both locking hinges out to the left/right
sides until they stop.
2.
Slide quick mount plate forward until the plate
disengages from the housing. (Figure 2.)
3.
Unhook quick mount plate from the wire hinge.
(Figure 3.)
4.
Install the quick mount plate onto a wet location
junction box (Supplied by Others) using the hardware
supplied (#8-32x3/4" or #6-32x3/4" screws). See
alignment guide above and the alignment arrows on the
quick mount plate label. (Figure 3.)
5.
Hang the luminaire to the quick mount plate by the wire
hinge. (Figure 4.)
CAUTION
Please ensure wire hinge is seated within both of the quick
mount plate retention hooks. Failure to do so may result in
personal injury or property damage.
Locking Hinge
Locking Screw
Figure 1.
2
EATON
IB515002EN
Quick Mount Plate
Locking Hinge
Locking Screw
Installation instructions
Slide Quick Mount Plate
Figure 2.
Alignment Guide Label
Align Arrows with
Driving Lane
Locking Hinge
Wire Hinge
Locking Screw
Figure 3.
Figure 4.
Wet Location
Junction Box
(Supplied by Others)
Quick Mount Plate
Locking Hinge
Housing Plate
Locking Screw
Retention Hooks
Wire Hinge

Publicidad

Tabla de contenido
loading

Tabla de contenido