PSA Zodiac Red Line Manual De Instalación Y De Uso página 14

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 41
Direction of circulation: The direction of water circulation shall be accordingly to the arrow located on the housing
of the appliance.
Caution: In event of vertical installation, direction of circulation shall be from the bottom to the top.
Test pressure: 4 bars
Service pressure: 2 bars
4

Publicidad

Tabla de contenido
loading

Productos relacionados para PSA Zodiac Red Line

Tabla de contenido