Important; Supplies Required; Pre-Installation Information - Bradley S19224 Serie Manual De Instalación

Ocultar thumbs Ver también para S19224 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
Read this installation manual completely to ensure proper installation, then file it with the owner
Installation
or maintenance department. Compliance and conformity to drain requirements and other local
codes and ordinances is the responsibility of the installer.
Packing List
Separate parts from packaging and make sure all parts are accounted for before discarding any
packaging material.
IS
T H
E
S ID
U P
Flush the water supply lines before beginning installation and after installation is complete. Test
the unit for leaks and adequate water flow. Main water supply to the eyewash should be "ON" at
all times. Provisions shall be made to prevent unauthorized shutoff.
The ANSI Z358.1 standard requires an uninterrupted supply of flushing fluid. Bradley plumbed
emergency fixtures require a minimum of 30 PSI (0.21 MPa) flowing pressure. Flushing fluid
should be tepid per ANSI Z358.1.
Self-closing spring-loaded valves are not UL classified to ANSI Z358.1.
The inspection and testing results of this equipment should be recorded weekly to verify proper
operation. This equipment should be inspected annually to ensure compliance with ANSI
Z358.1.
Workers who may come in contact with potentially hazardous materials should be trained
regarding the placement and proper operation of emergency equipment per ANSI Z358.1.
For questions regarding the operation or installation of this product, visit www.bradleycorp.com
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY
FAX: (262-251-5817)
http://www.bradleycorp.com
114-051
or call 800-BRADLEY (272.3539).
Product warranties and parts information may also be found under "Products" on our web site
at bradleycorp.com.
NOTICE!
Avoid cleaners containing organic solvents, alcohols, and hydrocarbons.
Rinse with water after cleaning.

Supplies Required:

• (4) ¼" anchors and bolts
• Teflon tape and pipe sealant
• Piping to ½" NPT water supply inlet (30–90 psi)
• Piping to 1¼" NPT drain outlet on unit (if included with unit)
• OPTIONAL: sign-mounting hardware
Local codes may require the installation of a backflow prevention valve to complete proper installation. Compliance with
local codes is the responsibility of the installer. Valve must be tested annually to verify that it is functioning properly.
Backflow prevention valves are not included with the fixture and may be supplied by the contractor or purchased from
Bradley Corporation.
Bradley • 215-1686 Rev. G; ECN 12-05-003C

IMPORTANT

9/21/2012
S19224
3

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Halo

Tabla de contenido