Mounting Instructions - PEUGEOT EnergyStand-189R Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 7

MOUNTING INSTRUCTIONS

2
Read all assembly instructions completely
before beginning to assemble.
Some components may be preassembled factory.
ASSEMBLY
Unfold 1 foot (2) and make sure they are locked in position as shown in Figure 1
and 2.
2 Slide extensions (C) in the frame (A) as shown in Figure 3.
Locking in position using the clamping wheels (F)
3 Install the servants (D) as shown in Figure 4.
Locking in position using the clamping wheels (F) as shown in Figure 5.
Place 4 Roofing brackets 2 (E) as shown in Figure 6.
Adjusting the spacing of the fasteners according to the machine.
For machines with non-parallel bindings, go to step
Fixations on non-aligned holes.
6 Use bolts nuts and washers to fix the holder on the machine as shown in
Figure 7.
Slide the machine forward or backward along the mounting block to better ba-
lance the machine on the stand. Tighten the nuts.
Attention to the specific hardware may be required following the machone to fix.
Ensure the stability of the whole before starting work.
Fixations on non-aligned holes:
For fixing nonaligned use metal parts (J) as shown in Figure 8.
Installation Procedure and folding
1 Remove the saw from the media.
2 Retract extensions to reduce the size of the bridge.
Press 3 to the pressure button for each tab in the folded upper portion of the
bridge until the snap latches in the closed position.
FIG8
J
G
E
I
H
FIG7
EN
FIG1
FIG2
FIG3
FIG4
FIG5
FIG6

Publicidad

Tabla de contenido
loading

Tabla de contenido