Initial Operation - Orderman Basisstation2 Instrucciones De Uso

Ocultar thumbs Ver también para Basisstation2:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

operating instructions
Routine care:
ALWAYS disconnect Base Station2 from the charger or the mains
before cleaning!
Caution
Cleaning notes:
Tip
Use a soft cloth moistened with a weak solution of a mild detergent and
water to clean Base Station2's exterior.
Do not use compressed air to clean Base Station2 or its components.
Before installing Base Station2 turn the included antenna clockwise until it
is stopped by the screw extension. This can be done manually.
Base Station2 is intended for setup indoors. It can be installed in a stand-
ing position or wall- or ceiling-mounted (upside down).
For optimum performance avoid installing Base Station2 near metallic ob-
jects.
The status display is controlled by means of the Oman.exe program.
For wall-mounting or attaching an expansion module (option), remove
Base Station2's antenna by rotating it counter-clockwise. Then remove the
screw by turning it counter-clockwise (can be done manually) and lift the
plastic cover and the illuminated ring (status display) from the housing.
The base plate has two holes for wall-mounting. Installation of the expan-
sion module is described in its operating instructions manual.
Additional information on initial operation can be found in the installation
instructions for the Orderman system.

Initial operation

6
Base Station2

Publicidad

Tabla de contenido
loading

Tabla de contenido