Descargar Imprimir esta página

Farelek ESSP 1 Manual De Instrucciones página 9

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

The better is your solar panel installation optimization the better will be
the performance.
IDEALS SOLAR PANEL INSTALLATION
• The solar panel must face south (see pictures bellow). To get the best performance, you
will have to adjust the angle of the panel according to the seasons.
1
90°
Summer
• Choose a none shaded areas ( trees, walls, houses...) during all the year.
• Plug in the solar panel in
90°
START UP
• The LED light
11
- OFF light = Solar light is not enough
- Red light = ESSP1 is charging
Be careful:
To conserve the battery performances, do not keep completely uncharged battery.
Be aware that during cloudness day or during night, the charging is week or none at all.
ESSP1 AS CHARGING DEVICE
CONNECTION AT DC12V / USB 5V PLUGS
230004-Manual-A.indd 9
N-E
N
N-O
socket of ESSP1.
07
indicates that the solar panel is charging or not the ESSP1.
© FAR GROUP EUROPE
Zenith
1
E
S
2
O
90°
2
90°
Winter
20/01/12 8:52:22

Publicidad

loading

Productos relacionados para Farelek ESSP 1