Descargar Imprimir esta página

Palram Balance Instrucciones De Montaje página 3

Ocultar thumbs Ver también para Balance:

Publicidad

IMPORTANT
Please read
these
instructions carefully before you start to assemble this greenhouse.
Keep
these
instructions
in
a
safe
place
for future
reference.
»
Customer Service
For
assistance
with
assembly or for replacement parts
-
please log
onto our website
or
call
our
service line
(number
is
on the
title
page).
Additional information
can be
found
at
our website: www.palramapplications.com
Safety Advice
It
is
of utmost importance to
assemble
all
of
the parts according to the directions.
Do
not
skip any step.
We
strongly recommend
using
work
gloves during assembly.
Always
wear
shoes and safety
goggles when working with extruded aluminium.
If using
a
step ladder or power tools ensure
that you follow the manufacturer's
safety advice.
Do
not touch overhead power cables
with
the aluminium profiles.
Do
not
attempt
to assemble the greenhouse
in
windy or wet conditions.
Dispose
of
all
plastic
bags. Keep
them out of
reach
of
small
children.
Keep
children away from the assembly
area.
Do
not
lean
against or push the greenhouse during construction.
Do
not position your greenhouse
in an area
exposed to excessive wind.
Do
not
attempt
to assemble this greenhouse if you
are
tired,
have
taken drugs or
alcohol or if you
are
prone to dizzy
spells.
Hot items such
as
recently
used
grills,
blowtorches
etc.
must not
be
stored
in
the
greenhouse.
Ensure
there
are no
hidden
pipes or cables
in
the ground before
inserting the
pegs.
This
product
is
designed to
be used
as
a
greenhouse only.
»
Care &
Maintenance
When
your greenhouse
needs
to
be
cleaned,
use
a
mild detergent solution and
rinse
with
cold
clean
water.
DO NOT use
acetone, abrasive cleaners or
other
special
detergents to
clean
the clear
panels.
It
is
recommended to check periodically that roof
panels caps (plastic
part
329 &
profile
981) are set in place.
»
Tools
&
Equipment
Work gloves
Rubber mallet
Phillips head screwdriver
Adjustable Spanner
/
Wrench
Leveler
Tape
measure
Silicone spray
/
Lubricant
Ladder
T001
-
Special
tool for
Screws
411
and nuts 412
Before
Assembly
Selecting
a
site:
-
The
greenhouse must
be
positioned
and fixed on
a
flat
level surface.
-
Choose
a
sunny position away
from
overhanging
trees.
IR
We
strongly recommend
this
greenhouse being secured directly to
a
solid concrete
foundation.
When
doing
that
use
the
pre
drilled
holes
in
the
metal
base.
IR
This
is a
multi-part
assembly best
achieved
by
two
people.
Allow
at least
a
half
a
day for the assembly
process.
Take all
components
&
parts
out of the
packages. Sort
the parts and check
against the
contents parts
list.
IR
Parts
should
be laid
out
close at hand.
Keep all small parts (screws etc.) in
a
bowl
so
they do not get
lost.
IR
Please
note multi-sided profiles
are used
in
this greenhouse.
As
a
result some
holes
in
the profiles
are
not
used
during
assembly.
IR
Please
review entire instructions before
starting. Carry
out the
assembly
steps in
exact order.
IR
Extension
Kit
assembly
instructions
are
included
in
this
IM. It
is
possible
to
purchase one
or more
kits.
Some
of
the
steps
and
comments
(marked) refer
only to the
Extension
Kit.
»
Notes
During Assembly
Peel
the film covering the
panel.
Make sure
you install it
with the
UV
protected
side up.
You
may
use
Silicon
lubricant
spray
in
order to help you
slide
the panels into
the profiles.
Do
not spray the Polycarbonate
panels.
Use
a
rubber mallet if
necessary.
MDuring
assembly you will encounter the
information
icon, please refer
to the relevant
assembly step
for additional comments and
assistance.
Step 13: Tighten the
screws
once the back beam
is
set
accordingly (diagram
b)
Step 51: Decide
on the
window's location before
assembly. Windows
can be
installed
in
one
of
the
4
indicated options.
If
you
have
purchased
an
Extension
Kit,
please
note part
7316 should
be
assembled
with
its
short end towards
the window.
Step 63:
Decide on
the window's location before
assembly. Windows
can be
installed
in
one
of
the
4
indicated options.
Step 79: Choose the appropriate anchoring according to
the existing
base. screws
and masonry anchors
are
not
supplied.
Please
note:
Anchoring this product to the ground
is
essential
to
its
stability and rigidity.
It
is
required to complete this stage
in
order for your
warranty to
be
valid.
Important
Recommendations
Firmly connect the greenhouse to
a
level
position
immediately after completion
of
the
assembly.
In
order to anchor the greenhouse
use
the
designated manufacturer anchoring kit.
Anchoring the greenhouse
can also be
done
by
drilling
the
base
profiles and fastening it to the
ground using ground
screws
or spikes
(screws and spikes are
not supplied).
Tighten
all screws
once assembly
is
completed.
Please
note: Anchoring this product to the ground
is
essential
to
its
stability
and
rigidity.
It
is
required to complete this stage
in
order for
your warranty to
be
valid.
Screws
411
and nuts
412 are used
throughout the
assembly
process.
Screws
411
are
to
be
assembled from the outside and nuts
412
from the inside of the greenhouse.
If
not specified otherwise, do not fasten
screws and nuts
(411 &
412)
more than
2-3
turns only.
Do
not
tighten them until completion of
the panels' assembly.
These
2
icons
indicate if
screws'
tig htening
is
required or not.
However,
in
some steps,
temporary tightening of
a
few
screws may be
needed to prevent
a
profile from falling.

Publicidad

loading