Operation & Controls - Essick 3D6 100 Manual De Uso Y Cuidado Del Propietario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Figure A : 3D6 100 Assembly and Wick Placement
3)
Make sure wicks are resting all the way into the water channel as indicated
by the illustrations.
Figure B: Water Bottle Filling
4)
Return each bottle to its upright position using the handle on the top of the
bottle. Set each bottle in its recessed area, the top of the bottle flush with
the top of the humidifier. When positioned properly, the valve will open and
water will flow into the water channel.
5)
We recommend using Essick Air Bacteriostat Treatment, P/N 1970
whenever you refill the humidifier reservoir to eliminate bacterial growth.
Add bacteriostat according to the instructions on the bottle.
6)
Plug cord into wall receptacle and turn humidifier on.
**When excessive condensation exists, a lower speed setting is
recommended.
CAUTION: Disconnect power before filling, cleaning or servicing unit. Keep
grille dry at all times.
OPERATION & CONTROLS
The humidifier should be placed at least FOUR inches away from any walls and
away from heat registers. Do not place on soft carpet. Unrestricted airflow into
the unit will result in the best efficiency and performance.
WATER CAP
3

Publicidad

Tabla de contenido
loading

Tabla de contenido