Function - Ingersoll Rand ENL 2 Instruciones De Instalación Y De Servicio

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

EN

7. FuNCTION

Via the inlet line (1) the condensate flows into the
ENL 2 and accumulates in the housing
(2).
A capacitive functioning sensor () continuously registers
the filling level and relays a signal to the electronic
control as soon as the container is filled.
The pilot valve (4) is activated and the membrane ()
opens the outlet line to discharge the condensate (6).
When the ENL 2 is empty, the outlet line is reclosed
tightly in time before unnecessary compressedair
losses occur.
When applying supply voltage, the ENL 2 carries out a
self-test.
The LED is lit orange for 1 second; subsequently, the
device changes over to the "ready-to-operate" state
and the LED is lit green.
Ready to operate, voltage is applied.
Test of the valve function (manual drainage):
Press and hold the push-button for approx. 2 s.
Do not use for permanent drainage.
80442866
ingersollrandproducts.com
7

Publicidad

Tabla de contenido
loading

Tabla de contenido