Users include
Installation instruction
1.
Installation on the ground
First of all, concrete base foot of 200mm height for anti-humidity, (Safe island)
should be built. Then, 220V 3 x 1.5mm power cable and 4 x 0.5mm control cable
tube should be laid under the middle of the casework. Fix turnstile gate in safe
island by screw. Connect turnstile with 220V power and control room
4 x M10 Screw
Park, tourist attraction, exhibition, sports
center, enterprise and institution, and other
special places
428
Installation size diagram of vertical turnstile
100
330
510
720
330
ENG
5