Delta Innovex Guia De Instalacion página 9

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

17
2
Self-adhesive, fire retardant pads are included to protect
the wall from flame while soldering supply pipes. If
soldering has already been completed or plastic supply
lines are being used, proceed to Step 19.
Remove backing from the self-adhesive pad and center pad
over opening for mixing valve and press firmly onto back
side of panel. Using a utility knife, trim pad to reveal mixing
valve hole.
19
Lower upper wall section onto middle section of wall. Ensure
pins go through holes on the middle wall.
3
8
18
Place lower wall on top of shower base.
20
Gap
CAUTION: DO NOT screw lower wall into side and wall
studs.
If screws are installed into the side studs, the upper shower
wall will not install properly.

Publicidad

Tabla de contenido
loading

Tabla de contenido