7 TRIM FLANGE ATTACHMENT
Position Flange (7A) on Valve (7B) with Drain Hole (7C) at the bottom. Place
Protective Washer (7D) on the short end of the reversible Retainer Sleeve
(7E). Screw Retainer Sleeve (7E) onto threaded section of the Stem and
Bonnet (7G). Tighten Retainer Sleeve (7E) by hand until Flange (7A) is snug
to finished wall surface. If the short end of the Retainer Sleeve (7E) is too
short, reverse it to use the longer end.
8
8A
8D
8C
8E
8 HANDLE ATTACHMENT
With valve in "CLOSED" position, place Handle Hub (8A) onto Valve Stem (8B),
connect Lever (8C) onto Handle Hub (8A). Attach and secure with Screw (8D).
Attach Decorative Button (8E).
7G
7B
7C
8B
ENGLISH
9
9 SHOWER ARM INSTALLATION
Insert the longer end of Shower Arm (9A) through the Shower Flange (9B).
Apply PTFE plumber's tape to both ends of Shower Arm (9A) according to
manufacturer's instructions. Screw the end of Shower Arm (9A) into pipe elbow
inside the wall. Slide Shower Flange (9B) tight to the wall.
10
10B
10 SPOUT INSTALLATION
Apply PTFE plumbers tape on both ends of Pipe Nipple (10A) (not included).
Screw Pipe Nipple (10A) into the elbow inside the wall and tighten with pipe
wrench. The Pipe Nipple (10A) is to project 3
Screw Tub Spout (10B) onto Pipe Nipple (10A) and tighten until Spout is properly
positioned and flush to the finished wall.
11 UNIT START UP
Turn on hot and cold water supplies, and check all connections for leaks.