Solvis BE-SC-2 Manual De Instrucciones página 9

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 14
Reinitialising SolvisControl
4. Assembly
Place the cover onto the base plate
from above after the electrical connec-
tion has been established. Before clos-
ing, ensure that the plug and the sock et
Reinitialising SolvisControl
1. Activate the "Installer" operating
mode.
2. Choose the tabs "Other" and
"Initialisation".
3. Go through the queries step by step.
The report filled in during the initial
startup can be of assistance in mak-
ing the correct entries. (
"Initialisation report", SolvisControl
– Installer operation, BAL-MAX-7-I).
4. Only select a room sensor for the
heating circuits that are really con-
nected to a room controller. Other-
wise, choose "No sensor".
Settings on SolvisControl
Set the room influence and the switch-
off condition "when the room tempera-
ture is reached" as described in
L 80-M – Subject to technical changes 08.16
board of the plug connection are
aligned. If nothing is shown on the dis-
play after switching the system on, the
poles of the connection lines may be
reversed (swap the wires).
Heating
Water
Circula.
Solar
Other
Main menu
section
Are you sure you want to restart initialisation?
All system parameters will be overwritten!
Initialisation
section "Heating" in the Operating
Instructions for Installers, BAL-MAX-7-I.
MAIN MENU
INITIALISATION
Yes
EN
Input
Output
Message
Data
No
9
9

Publicidad

Tabla de contenido
loading

Productos relacionados para Solvis BE-SC-2

Este manual también es adecuado para:

15262

Tabla de contenido